Vis enkel innførsel

dc.contributor.authorKalsaas, Bo Terje
dc.contributor.authorRullestad, Anders
dc.contributor.authorThorud, Hanne S.
dc.date.accessioned2020-10-02T09:13:05Z
dc.date.available2020-10-02T09:13:05Z
dc.date.created2020-01-16T15:27:03Z
dc.date.issued2020
dc.identifier.citationKalsaas, B. T., Rullestad, A. & Thorud, H. S. (2020). Continuous Improvement on Detailed Design Phase: A Process Perspective. Journal of Engineering, Project, and Production Management, 10(2), 103-113. doi:en_US
dc.identifier.issn2223-8379
dc.identifier.urihttps://hdl.handle.net/11250/2680859
dc.description.abstractThe construction project being studied is a government investment related to the relocation of a biomedical institute delivering research-based knowledge and contingency support in the fields of animal health, fish health and food safety. The project covers a total of 63,000 square meters distributed over 10 buildings with a very high degree of complexity. The design alone has required 1 million hours, which relates to a client cost of about 100 million Euro. The purpose of this paper is to study the applied methodology for managing the detailed design to identify lessons learned from the project. The theory underlying the study is inspired by lean design management and design theory linked to design as phenomena, including reciprocal interdependencies, iteration, decomposition, design as a “wicked problem”, learning, gradual maturation, etc. The article is based on an abductive research design and has been implemented as a case study where both qualitative and quantitative methods have been used.en_US
dc.language.isoengen_US
dc.publisherDe Gruyter Polanden_US
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.titleContinuous Improvement on Detailed Design Phase : A Process Perspectiveen_US
dc.typeJournal articleen_US
dc.typePeer revieweden_US
dc.description.versionpublishedVersionen_US
dc.rights.holder© 2020 Association of Engineering, Project, and Production Managementen_US
dc.subject.nsiVDP::Teknologi: 500en_US
dc.source.pagenumber103-113en_US
dc.source.volume10en_US
dc.source.journalJournal of Engineering, Project, and Production Managementen_US
dc.source.issue2en_US
dc.identifier.doi10.2478/jeppm-2020-0013
dc.identifier.cristin1775108
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal