Vis enkel innførsel

dc.contributor.authorKonradsen, Kjartan Topstad
dc.date.accessioned2018-09-18T07:10:48Z
dc.date.available2018-09-18T07:10:48Z
dc.date.issued2018
dc.identifier.urihttp://hdl.handle.net/11250/2563066
dc.descriptionMaster's thesis Renewable Energy ENE500 - University of Agder 2018nb_NO
dc.description.abstractChassix from south of Norway attempt to reduce their energy demand by sending waste heat to a Central Heating System, (CHS), named Case 1. The CHS heat the ventilation systems, space heat and water heating. The waste heat used is from the Sand Recycling Process, (SRP), and the Aluminum Cooling Process, (ACP). The ACP and a 600kW cooling tower are installed in May/June. Since the CHS is close to the ventilation systems using Battery Heat Exchanger, BHE, a possibility for utilizing the ventilation systems as a cooling tower, named Case 2. Case 2 is an attempt to reduce investment cost by replacing investment cost for installing the cooling tower. The potential heat recovery for CHS needed to be estimated. The estimation was based on dimension data at the building and from an Enova statistic. Estimated capacity was then compared with actual capacity from CHS. The potential heat recovery was estimated to be 1 012-1 142MWh/year, but actual data indicate that it might be lower. Case 1 is possible with reduced production at ambient temperatures above 17.5_C. With temperature above 22_C, the process needs to operate at 93%, due to possible cooling. Installing Case 1 and Case 2 are estimated as the most economically ffcient that only need 19% support from Enova to have a payback time in three years. Case 1 needs 34% support from Enova. Since the ventilation systems were 20 years old and are soon to rebuild, Chassix decided not to install Case 2.nb_NO
dc.language.isoengnb_NO
dc.publisherUniversitetet i Agder ; University of Agdernb_NO
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.subjectENE500nb_NO
dc.titleWaste heat utilization for central heating and ventilation systems at Chassix Norwaynb_NO
dc.typeMaster thesisnb_NO
dc.subject.nsiVDP::Teknologi: 500::Elektrotekniske fag: 540nb_NO
dc.source.pagenumber63 p.nb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal